CMPS115, Milestone 7
System Test Report and Error Report Instructions
Assignment due in lab:
- Program. Your team's properly documented, debugged, and tested program. This is worth
20% of the STRER points.
- System Test Report: This report summarizes the testing that was done.
Include a description of the environment in which the testing was done. This
should include the hardware and software of the system. If an output
report is produced by your system, then multiple copies of this output
should be included, one for each test. This is worth 5% of the STRER
points.
- Error Report: This report provides a chronological record of relevant
details about the execution of the testcases specified in the Testcase
Specifications (TS) that resulted in failures. Include a sequence number
representing the test case used, the actual output, your
determination of the defect that caused the failure, and the action
taken. This is worth 65% of the STRER points.
- Group time recording log. This is worth 5% of STRER points.
- Group meeting notes. This is worth 5% of STRER points.