Each student team is required to maintain a project notebook and a project Web site, each containing all project materials developed to date.
Teams are required to have:
These documents must be submitted with every project phase except for project selection, configuration control, software inspection, and acceptance test performance.
The following are links to descriptions of each project deliverable, and templates that can be used as a starting point for project documents.
| Project Selection | Description | Template | ||
| Reverse-engineered UML | Description | |||
| Scenarios | Description | Template | ||
| Configuration Control | Description | |||
| Requirements | Description | Template | ||
| Time estimate & risk analysis | Description | Template | ||
| User manual | Description | Template | ||
| Design document | Description | Template | ||
| Acceptance test plan | Description | Template | Grading Guidelines | |
| Software inspection | Description | Forms | Grading Guidelines | |
| Acceptance Test Performance | Description | Grading Guidelines | ||
| Final project notebook | Description | Grading Guidelines |
Last updated: